TxDOT will be performing culvert testing on SH 206 Monday morning, September 28th that will result in a temporary bridge closure.
Testing will begin around 8 AM Monday at the bridge which is located 3.5 miles south of Cross Plains.
To allow for accurate testing, several 5 minute closures of the bridge in this location will occur, stopping traffic in both directions of travel. Motorists are urged to use an alternate route or allow additional time to arrive at their destination. Please use caution as you pass through the work zone, pay attention to road signs and reduce your speed.